Initial Study/Mitigated Negative Declaration Potable Water System Improvements Consolidation of Water Systems
Bighorn Final Initial Study/Mitigated Negative Declaration
CEQA RESOURCES:
Biological – Cultural – Paleo Resources Report
Biological Field Map 1 – Final Alignment
Biological Field Map 2 – Final Alignment
AB 52 Consultation Documents
Summary of AB52 Consultation Effort
Phase 1 Testing Memorandum – Final
Army Corps of Engineers Consultation
Army Corps of Engineers Non-Jurisdictional Determination
POTABLE WATER SYSTEMS IMPROVEMENTS CONSOLIDATION OF WATER SYSTEMS
SWRCB Grant Agreement No. D21020265 Project No. 3610009-002C
Design Drawings – draft
Landers Pipeline Segments (approx. 90%)
Zone B Transmission Pipelines (approx. 10%)
Zone B Pump Station/Zone D Pump Station (5%)
Google Earth Alignment Overlays (approximate)
G.E. Landers Pipeline Segments
G.E. Zone B Transmission Pipelines